How ABACORP kept a mixed-use project moving and saved $350,000 in variation cost

PROJECT SIZE

COMPLETED

CLIENT

EVT

PROJECT LENGTH

Resolving Design Discrepancies Without Delays

On a mixed-use development, unforeseen design discrepancies emerged during the early stages of construction. Such issues usually cause costly delays, as projects grind to a halt while drawings are revised.

“With the discrepancies on the drawings, we were worried the whole site would come to a standstill,” said the client.

Instead, ABACORP took a collaborative and proactive approach, working side by side with designers and consultants to resolve clashes in real time. Rather than waiting for redesigns to be finalised, construction works continued seamlessly while adjustments were made in parallel.

This strategy not only maintained progress but also avoided over $350,000 in preliminaries and variation costs.

For the client, the project kept moving without disruption, delivering both budget certainty and efficiency.

This case showcases ABACORP’s ability to problem-solve under pressure and keep projects moving, even when challenges arise unexpectedly.